EATON BladeUPS® (12 kVA) User's Guide 164201649 Rev 4www.eaton.com/powerquality 17Chapter 3 InstallationThis chapter explains: Equipment inspection Required tools Unpacking the cabinet Parallel system setup Extended Battery Module (EBM) setup and installation (optional) UPS setup and installation, including UPS internal batteries Parallel installation (optional) Initial startupInspecting the EquipmentIf any equipment has been damaged during shipment, keep the shipping cartons andpacking materials for the carrier or place of purchase, and file a claim for shippingdamage. If you discover damage after acceptance, file a claim for concealed damage.To file a claim for shipping damage or concealed damage: 1) File with the carrierwithin 15 days of receipt of the equipment; 2) Send a copy of the damage claimwithin 15 days to your service representative.NOTE Check the battery recharge date on the shipping carton label. If the date has expired and thebatteries were never recharged, do not use the UPS. Contact your service representative.Tools RequiredTo assemble the components, you may need the following tools: Medium flat-bladed screwdriver Short-handled #2 Phillips® screwdriver Long-handled #2 Phillips screwdriver 7 and 8 mm wrench or socket