2303/11 MN05013002Z-EN3 EU5C-SWD-DP commissioningBefore switching on, check whether the power supply for thegateway is connected correctly . The configuration andinstallation of the SmartWire-DT network must also havebeen carried out correctly (with all slaves connected).If you have already integrated devices into a system, securethe operating range of any connected parts of the systemagainst access so that nobody is endangered, for example,by motors starting up unexpectedly.Commissioning takes place in several steps:X Putting the SmartWire-DT network into operationX Create a connection to the field bus.X Load and start the PLC program.Putting the SmartWire-DTnetwork into operationBefore the gateway can exchange data with the PLC, a validSmartWire-DT network configuration (a so-called gatewaytarget configuration) has to be stored in the gateway. This iscompared with the current configuration (actual configura-tion) each time the gateway is restarted. If the gatewayascertains in this process that a SmartWire-DT slave cannotbe reached or a wrong slave type is determined, the Smart-Wire-DT network will not go into operation (to be precisethis is dependent on the network configuration). Reading ofthe SmartWire-DT network configuration takes place bypressing the configuration button on the gateway. All Smart-Wire-DT slaves are re-addressed in ascending order in theprocess. This process may only take place in the case of:• initial commissioning,• the replacement of a defective slave or• a change to the configuration.