E.1 APOGEE FLN Set-UpA Yaskawa America representative is responsible for proper configuration of the Bypass for its primary application, while aSiemens Building Technologies representative is responsible for field panel programming to make use of the Bypassfunctionality in the building automation system. As such, there must be coordination between the Yaskawa America andSiemens Building Technologies representatives to ensure that the programming of the drive is consistent with the particularapplication requirements. After verifying that the drive installation and wiring are correct, apply power to the drive. Refer toDrive Communication Parameter Settings on page 408 lists parameters and values required for proper APOGEE FLNcommunication and control.u Z1000 Bypass Parameter Settings for APOGEE FLN CommunicationsTable E.1 Drive Communication Parameter SettingsParameter Number Digital Operator Display Settings for APOGEE FLN CommunicationZ1-07 Reference Source 2: Serial ComZ1-08 Run Source 2: Serial ComZ3-02 Serial Comm Adr Select the Bypass addressZ3-03 Serial Baud Rate 2: 4800 BaudZ3-01 Protocol Select 2: P1NOTICE: A Yaskawa representative should set the drive parameters to their appropriate values. Changes made to the parameters otherthan what is listed in the table above can result in damaging the drive or building equipment.E.1 APOGEE FLN Set-Up408 YASKAWA ELECTRIC SIEP YAIZ1B 01E YASKAWA AC Drive – Z1000 Bypass Technical Manual