Service Manual February 2017Checklist C Procedures52 S-80 • S-85 • S-80X Part No. 1259369GTC-6Grease the Platform OverloadMechanism (if equipped)Genie specifications require that this procedure beperformed every 500 hours or six months,whichever comes first.Perform this procedure more often if dustyconditions exist.Application of lubrication to the platform overloadmechanism is essential to safe machine operation.Continued use of an improperly greased platformoverload mechanism could result in the system notsensing an overloaded platform condition and willresult in component damage.1 Locate the grease fittings on each pivot pin ofthe platform overload assembly.2 Thoroughly pump grease into each greasefitting.Grease SpecificationChevron Ultra-duty grease, EP NLGI 1 (lithium based)or equivalentC-7Test the Platform OverloadSystem (If equipped)Genie specifications require that this procedure beperformed every 500 hours or six months,whichever comes first OR when the machine failsto lift the maximum rated load.Testing the platform overload system regularly isessential to safe machine operation. Continued useof an improperly operating platform overloadsystem could result in the system not sensing anoverloaded platform condition. Machine stabilitycould be compromised resulting in the machinetipping over.Note: Perform this procedure with the boom fullyretracted and in the stowed position and with themachine on a firm, level surface.1 Remove all weight, tools, accessories andequipment from the platform.Note: Failure to remove all weight, tools andaccessories from the platform will result in aninaccurate test.2 Turn the key switch to ground control and pullout the red Emergency Stop button to the onposition at both the ground and platformcontrols. Start the engine from the groundcontrols and level the platform. Do not turn theengine off.3 Determine the maximum platform capacity.Refer to the machine serial plate.