1.3 Product documentation1.3.1 Product documentation setIEC07000220-3-en.vsdPlanning & purchaseEngineeringInstallingCommissioningOperationMaintenanceDecommissioningDeinstalling & disposalApplication manualOperation manualInstallation manualEngineering manualCommunicationprotocol manualTechnical manualCommissioning manualIEC07000220 V3 ENFigure 1: The intended use of manuals throughout the product lifecycleThe engineering manual contains instructions on how to engineer the IEDs using thevarious tools available within the PCM600 software. The manual providesinstructions on how to set up a PCM600 project and insert IEDs to the projectstructure. The manual also recommends a sequence for the engineering of protectionand control functions, LHMI functions as well as communication engineering for IEC60870-5-103, IEC 61850 and DNP 3.0.The installation manual contains instructions on how to install the IED. The manualprovides procedures for mechanical and electrical installation. The chapters areorganized in the chronological order in which the IED should be installed.The commissioning manual contains instructions on how to commission the IED. Themanual can also be used by system engineers and maintenance personnel forassistance during the testing phase. The manual provides procedures for the checkingof external circuitry and energizing the IED, parameter setting and configuration aswell as verifying settings by secondary injection. The manual describes the process oftesting an IED in a substation which is not in service. The chapters are organized in theSection 1 1MRK 504 135-UEN AIntroduction30Technical manual