Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual P-164000371—Rev 05 11CChhaapptteerr 33 IInnssttaallllaattiioonn PPllaann aanndd UUnnppaacckkiinnggThis chapter includes planning and unpacking for the Eaton 93PM Integrated Accessory Cabinet-Tie (IAC-T).Use the following basic sequence of steps to install the IAC-T:1. Create an installation plan for the IAC-T.2. Prepare your site for the IAC-T.3. Inspect and unpack the IAC-T.4. Unload and install the IAC-T, and wire the system.5. Complete the Installation Checklist.6. Have authorized service personnel perform preliminary operational checks and start up the system.NOTE Startup and operational checks must be performed by an authorized Eaton CustomerService Engineer, or the warranty terms specified on the product's resources pagebecome void. See Chapter 9 Warranty for details. This service is offered as part of thesales contract for the UPS. Contact an Eaton service representative in advance (aminimum two-week notice is required) to reserve a preferred startup date.33..11 CCrreeaattiinngg aann IInnssttaallllaattiioonn PPllaannBefore installing the IAC-T, read and understand how this manual applies to the system being installed. Use theprocedures and illustrations in this section to create a logical plan for installing the IAC-T. This section containsthe following information:• Physical features and requirements, including dimensions• Power wiring installation notes• Location of conduit and wire entry landing plates• Location of power terminals33..22 PPrreeppaarriinngg tthhee SSiitteeFor the UPS system to operate at peak efficiency, the installation site should meet the environmentalparameters outlined in this manual. The operating environment must meet the weight, clearance, andenvironmental requirements specified for the applicable accessory cabinet. Specifications subject to change.33..22..11 EEnnvviirroonnmmeennttaall aanndd IInnssttaallllaattiioonn CCoonnssiiddeerraattiioonnssThe UPS system installation, including the IAC-T, must meet the following guidelines:• The system must be installed on a level floor suitable for computer or electronic equipment.• The system must be operated at an altitude no higher than 1500m (5000 ft) without derating. For additionalassistance with high altitude operation, contact an Eaton service representative (see paragraph1.8 Getting Help).• The system must be installed in a temperature and humidity controlled indoor area free of conductivecontaminants.Failure to follow guidelines may void your warranty.The basic environmental requirements for operation of the IAC-T are:• Ambient Temperature Range: 5–40°C (41–104°F)• Recommended Operating Range: 5–40°C (41–104°F)