Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual P-164000371—Rev 05 393.2.2 IAC-T Power Wiring Preparation, Table 3, Table 4, or Table 5 for IAC-T wiring and terminationrequirements. Refer to the Eaton 93PM Integrated Accessory Cabinet-Distribution (50 kW, 100 kW, 150kW, and 200 kW IAC-D) Installation and Operation Manual, listed in paragraph 1.7 For More Information,for IAC-D conduit and terminal locations and termination requirements.16. Connect MOB Ground, phase A, B, and C power wiring to the corresponding MOB input terminals on IAC-T.For a detailed view of the IAC-T MOB input terminals, see Figure 13.17. Connect the MOB Ground, phase A, B, and C power wiring from the IAC-T to the corresponding UPSpower terminals. Connect Ground, phase A, B, and C power wiring to the output terminals on the IAC-T.18. Connect the Ground, phase A, B, and C output power wiring from the IAC-T output terminals to the criticalload or Integrated Accessory Cabinet-Distribution (IAC-D).For a detailed view of the IAC-T output terminals, see Figure 14.19. If wiring interface connections, proceed to paragraph 4.4 Installing IAC-T Interface Connections; otherwise,proceed to Step 20.20. Reinstall the internal safety shield panel removed in Step 3.21. Close the outside door and secure the latch.22. After the IAC-T is installed and wired, return to the applicable Eaton 93PM UPS Installation and Operationmanual, listed in paragraph 1.7 For More Information, to complete the UPS wiring.Installation