30 Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual P-164000371—Rev 05WARNINGThe IAC-T is heavy (see Table 1). If unpacking and unloading instructions are not closely followed, the cabinetmay tip and cause serious injury.1. Carefully inspect the outer packaging for evidence of damage during transit.CAUTIONDo not install a damaged cabinet. Report any damage to the carrier and contact an Eaton service representativeimmediately.NOTE For the following step, verify that the forklift or pallet jack is rated to handle the weightof the cabinet (see Table 1 for cabinet weight).2. Use a forklift or pallet jack to move the packaged cabinet to the installation site, or as close as possible,before unpacking. If possible, move the cabinet using the pallet. Insert the forklift or pallet jack forksbetween the supports on the bottom of the pallet. See Figure 7 for the IAC-T center of gravitymeasurements.CAUTIONDo not tilt the IAC-T more than 10° from vertical or the cabinet may tip over.3. Set the pallet on a firm, level surface, allowing a minimum clearance of 3m (10 ft) on each side forremoving the cabinet from the pallet.4. Remove the protective packaging material from the cabinet and recycle in a responsible manner. Retainthe parts kit box packed at the top of the cabinet.5. Inspect the contents for any evidence of physical damage, and compare each item with the Bill of Lading.If damage has occurred or shortages are evident, contact an Eaton service representative immediately todetermine the extent of the damage and its impact on further installation.NOTE While waiting for installation, protect the unpacked cabinet from moisture, dust, andother harmful contaminants. Failure to store and protect the IAC-T properly may voidyour warranty.Installation Plan and Unpacking