Eaton 93PM IAC-T Series Installation And Operation Manual
Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual P-164000371—Rev 05 494. If wiring the IAC-T input power terminals using the inter-cabinet wiring access pass-through (line-up-and-match configurations), proceed to Step 5; if wiring the IAC-T input power terminals using the bottom entryaccess, proceed to Step 10; if wiring the IAC-T input power terminals using the top entry access, proceedto Step 15.5. Pass-through Wiring. Route the IAC-T MOB input cables (phase A, B, and C and Ground) from the UPScabinets through the bottom UPS and IAC-T inter-cabinet wiring access pass-through to the IAC-T MOBinput terminals. See Figure 10 for IAC-T wiring access information and Figure 15, Figure 16, or Figure 17for IAC-T terminal locations. See paragraph 3.2.2 IAC-T Power Wiring Preparation, Table 5, Table 6, orTable 7 for IAC-T wiring and termination requirements. Refer to the applicable Eaton 93PM UPS Installationand Operation manual, listed in paragraph 1.7 For More Information, for the UPS terminal locations andtermination requirements.6. Remove the top or bottom conduit plate (see Figure 11) from the IAC-T. Identify all input and outputconduit requirements and mark their location. Drill and punch all conduit holes in the conduit plate prior tomounting on the IAC-T. Reinstall the conduit plate. Install conduit between the IAC-T and the critical load orIntegrated Accessory Cabinet-Distribution (IAC-D). Pull the wiring through conduit into the wiring area.7. Route the output cables (phase A, B, and C and Ground) from the IAC-T through the top or bottom of thecabinet to the critical load. See Figure 15, Figure 16, or Figure 17 for IAC-T terminal locations. Seeparagraph 3.2.2 IAC-T Power Wiring Preparation, Table 5, Table 6, or Table 7 for IAC-T wiring andtermination requirements. Refer to the Eaton 93PM Integrated Accessory Cabinet-Distribution (50 kW, 100kW, 150 kW, and 200 kW IAC-D) Installation and Operation Manual, listed in paragraph1.7 For More Information, for IAC-D conduit and terminal locations and termination requirements.8. Route the maintenance bypass input (phase A, B, and C, and Ground) through the top or bottom of theIAC-T to the MBP terminals. See Figure 15, Figure 16, or Figure 17 for IAC-T terminal locations. Seeparagraph 3.2.2 IAC-T Power Wiring Preparation, Table 5, Table 6, or Table 7 for IAC-T wiring andtermination requirements.9. Proceed to Step 19.10. Bottom Entry Wiring. Remove the bottom conduit plate (see Figure 11) from the inside bottom of theIAC-T. Identify all conduit requirements (both input and output) and mark their location. Drill and punch allconduit holes in the bottom conduit plate prior to mounting on the IAC-T. Install the conduit plate andinstall all conduit runs into the plate. Pull the wiring through conduit into the wiring area.11. Route the IAC-T MOB input cables (phase A, B, and C and Ground) from the UPS cabinets through thebottom of the IAC-T to the IAC-T MOB input terminals. See Figure 10 for IAC-T wiring access informationand Figure 15, Figure 16, or Figure 17 for IAC-T terminal locations. See paragraph3.2.2 IAC-T Power Wiring Preparation, Table 5, Table 6, or Table 7 for IAC-T wiring and terminationrequirements. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed inparagraph 1.7 For More Information, for the UPS terminal locations and termination requirements.12. Route the output cables (phase A, B, and C and Ground) from the IAC-T through the bottom of the cabinetto the critical load. See Figure 15, Figure 16, or Figure 17 for IAC-T terminal locations. See paragraph3.2.2 IAC-T Power Wiring Preparation, Table 5, Table 6, or Table 7 for IAC-T wiring and terminationrequirements. Refer to the Eaton 93PM Integrated Accessory Cabinet-Distribution (50 kW, 100 kW, 150kW, and 200 kW IAC-D) Installation and Operation Manual, listed in paragraph 1.7 For More Information,for IAC-D conduit and terminal locations and termination requirements.13. Route the maintenance bypass input (phase A, B, and C, and Ground) through the bottom of the IAC-T tothe MBP terminals. See Figure 15, Figure 16, or Figure 17 for IAC-T terminal locations. See paragraph3.2.2 IAC-T Power Wiring Preparation, Table 5, Table 6, or Table 7 for IAC-T wiring and terminationrequirements.14. Proceed to Step 19.15. Top Entry Wiring. Remove the top conduit plate (see Figure 11) from the top of the IAC-T. Identify allconduit requirements (both input and output) and mark their location. Drill and punch all conduit holes inInstallation |
Related manuals for Eaton 93PM IAC-T Series
Eaton RE Series Installation Manual
Eaton REC Series Installation Manual
Eaton PDI JCOMM Installation And Operation Manual
Eaton EBC-S User And Installation Manual
Eaton CI Series Installation Instructions Manual
Eaton ExoCab34 User And Installation Manual
Eaton IBC-SW Installation Manual
Eaton EX RT 5 3:1 Installation And User Manual
Eaton CROUSE-HINDS SERIES Operating Instructions Manual
Eaton CROUSE-HINDS SERIES Operating Instructions Manual
This manual is suitable for:
manualsdatabase
Your AI-powered manual search engine