34 Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual P-164000371—Rev 053. Locate the four 1/2" jacking bolts from the parts kit and install them in the threaded holes in the front andrear supports as shown in Figure 9. Place a floor protector from the parts kit underneath each jacking bolt,and screw the bolts down against them.The floor protectors protect the floor from being marred by the jacking bolts.Figure 9. emoving the Pallet Skids and Supports – Eaton 93PM 50 kW IAC-T or 93PM 100 kW IAC-TCabinetMounting Bolts(4 places front)(4 places rear)Pallet SkidSkid Mounting Bolts(4 places front)(4 places rear)Floor Protectors(2 places front)(2 places rear)Right SideCabinet SupportRear CabinetSupportJacking Bolts(2 places front)(2 places rear)Front CabinetSupportCabinetSupport Bolts(2 places ateach corner)Left SideCabinet SupportWARNINGDo not remove or loosen the cabinet mounting or cabinet support bolts until instructed. If unpacking andunloading instructions are not closely followed, the cabinet may tip and cause serious injury or death.4. Loosen, but do not remove, the skid mounting bolts holding the pallet skids to the front and rear supports,and to the left and right side supports (see Figure 9).WARNINGRISK OF INSTABILITY. Turning the jacking bolts unevenly may cause the cabinet to become unbalanced. Toprevent tipping the cabinet, raise the cabinet no more than 3 mm (1/8") above the floor (just enough to allow theremoval of the pallet skids). Failure to follow these instructions can result in serious injury or death.5. Turn each jacking bolt consecutively, two full turns, until the pallet skids clear the floor by approximately3 mm (1/8").Installation