1.3 Product documentation1.3.1 Product documentation setIEC07000220-3-en.vsdPlanning & purchaseEngineeringInstallingCommissioningOperationMaintenanceDecommissioningDeinstalling & disposalApplication manualOperation manualInstallation manualEngineering manualCommunicationprotocol manualTechnical manualCommissioning manualIEC07000220 V3 ENFigure 1: The intended use of manuals throughout the product lifecycleThe engineering manual contains instructions on how to engineer the IEDs using thevarious tools available within the PCM600 software. The manual provides instructions onhow to set up a PCM600 project and insert IEDs to the project structure. The manual alsorecommends a sequence for the engineering of protection and control functions, LHMIfunctions as well as communication engineering for IEC 60870-5-103, IEC 61850 andDNP 3.0.The installation manual contains instructions on how to install the IED. The manualprovides procedures for mechanical and electrical installation. The chapters are organizedin the chronological order in which the IED should be installed.The commissioning manual contains instructions on how to commission the IED. Themanual can also be used by system engineers and maintenance personnel for assistanceSection 1 1MRK 511 287-UUS AIntroduction32Technical manual