6H128-08 and 6H129-08 User’s Guide3-1CHAPTER 3INSTALLATIONThis chapter covers the required tools and instructions for installing the6H12X-08 module into the 6C105 SmartSwitch 6000 chassis. Follow theorder provided below to correctly install the 6H12X-08.• Unpacking the 6H12X-08 (Section 3.1)• Installing options (Section 3.2)• Installing the 6H12X-08 into the 6C105 chassis (Section 3.3)• Connecting to the network (Section 3.4)• Completing the installation (Section 3.5)3.1 UNPACKING THE 6H12X-08To unpack the shipment, proceed as follows:1. Open the box and remove the 6H12X-08 from the shipping box. Saveall shipping material in case any items need to be returned.2. Verify the contents of the carton as listed in Table 3-1.Only qualified personnel should install the 6H12X-08.!CAUTIONFailure to observe static safety precautions could causedamage to the 6H12X-08. Follow static safety handling rulesand use the antistatic wrist strap provided with the 6C105chassis.!CAUTIONDo not cut the non-conductive bag to remove the module.Damage could result from sharp objects contacting the boardor components.