Page 364 of 906 NT5D97 Dual-port DTI2/PRI2 card553-3001-211 Standard 3.00 August 20058 Run and connect the NT5D97 cables.9 If required, install connecting blocks at the MDF or wall mountedcross-connect terminal.10 If required, designate connecting blocks at the MDF or wall mountedcross-connect terminal.11 If required, install a Network Channel Terminating Equipment (NCTE). orLine Terminating Unit (LTU).12 Add related office data into switch memory.13 Enable faceplate switch S1. This is the “Loop Enable” switch.The faceplate LEDs should go on for 4 seconds then go off and theOOS, DIS and ACT LEDs should go on again and stay on.IF DDCH is installed, the DCH LED should flash 3 times.14 Run the PRI/DTI Verification Test.15 Run the PRI status check.End of ProcedureProcedure 15Removing the NT5D971 Determine the cabinet and shelf location of the NT5D97 card to beremoved.2 Disable Network Loop using LD 60. The command is DISL “loop number.”The associated DCHI might have to be disabled first. The faceplate switchENB/DIS should not be disabled until both PRI2/DTI2 loops are disabledfirst.CAUTIONClock Controller cables connecting the ClockController and NT5D97 card must NOT be routedthrough the center of the cabinet past the powerharness. Instead they should be routed around theoutside of the equipment shelves.