Genie Z-30/20N manuals
Z-30/20N
Table of contents
- April
- safety rules
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- specifications
- Machine Component Weights
- Performance Specifications
- Hydraulic Component Specifications
- machine torque specifications
- Hydraulic Hose and Fitting Torque Specifications
- Torque Procedure
- Scheduled Maintenance Procedures
- Pre-Delivery Preparation Report
- maintenance inspection report
- Checklist A Procedures
- A-2 Perform Pre-operation Inspection
- A-4 Perform 30 Day Service
- A-6 Replace the Drive Hub Oil
- Checklist B Procedures
- B-2 Inspect the Electrical Wiring
- B-3 Inspect the Tires, Wheels and Lug Nut Torque
- B-4 Confirm the Proper Brake Configuration
- B-6 Test the Ground Control Override
- B-8 Test the Drive Brakes
- B-10 Test the Drive Speed - Raised or Extended Position
- B-11 Test the Alarm Package (if equipped)
- B-12 Test the Turntable Rotation Stop
- B-14 Perform Hydraulic Oil Analysis
- Checklist C Procedures
- Checklist D Procedures
- D-2 Check the Free-wheel Configuration
- D-3 Check the Turntable Rotation Bearing Bolts
- D-4 Replace the Drive Hub Oil
- D-6 Inspect for Turntable Bearing Wear
- Checklist E Procedures
- E-2 Grease the Steer Axle Wheel Bearings
- repair procedures
- platform controls
- platform components
- platform rotator
- platform overload system
- jib boom
- Jib Boom Bell Crank (models without rotating jib boom)
- jib boom lift cylinder
- primary boom components
- Primary Boom
- How to Disassemble the Primary Boom
- primary boom lift cylinder
- boom extension cylinder
- Platform Leveling Master Cylinder
- secondary boom components
- Secondary Boom
- secondary boom lift cylinder
- hydraulic pump
- function manifold components
- Valve Adjustments - Function Manifold
- How to Adjust the Secondary Boom Down Relief Valve
- How to Adjust the Turntable Rotate Relief Valve
- Jib Boom and Platform / Jib Boom Rotate Manifold Components
- valve coils
- How to Test a Coil Diode
- turntable rotation components
- Steer Axle Components
- Non-steer Axle Components
- fault codes
- Fault Code Charts
- Section 6 Schematics
- Electrical Symbol Legend
- hydraulic symbols legend
- limit switch location legend
- Power Cable Wiring Diagram
- Drive Contactor Panel Wiring Diagram
- Manifold and Limit Switch Wiring Diagram
- LVI/BCI Option Wiring Diagram
- Work and Drive Lights Option
- CTE Option, (CE Models)
- Charger Interlock Option
- Hydraulic Schematics
- hydraulic schematic
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA / AS), (before serial numbers Z3010-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Z34N14-10983 and Z3414-9685
Z-30/20N
Table of contents
- September
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Specifications
- Performance Specifications
- Hydraulic Specification
- Hydraulic Component Specifications
- Machine Torque Specifications
- Hydraulic Hose and Fitting Torque Specifications
- Torque Procedure
- SAE and Metric Fasteners Torque Charts
- Repair Procedures
- Platform Controls
- Platform Components
- Platform Rotator
- Platform Overload System
- Jib Boom Components
- Jib Boom Bell Crank (models without rotating jib boom)
- Jib Boom Bell Crank (models with rotating jib boom)
- Jib Boom Lift Cylinder
- Primary Boom
- How to Disassemble the Primary Boom
- Primary Boom Lift Cylinder
- Primary Boom Extension Cylinder
- Platform Leveling Master Cylinder
- Secondary Boom Components
- Secondary Boom
- Secondary Boom Lift Cylinders
- Hydraulic Pump
- Manifolds
- Valve Adjustments - Function Manifold
- How to Adjust the Secondary Boom Down Relief Valve
- How to Adjust the Turntable Rotate Relief Valve
- Jib Boom and Platform / Jib Boom Rotate Manifold Components
- Valve Coils
- How to Test a Coil Diode
- Turntable Rotation Components
- Steer Axle Components
- Non-steer Axle Components
- Fault Code Charts
- Section 5 Schematics
- Electrical Symbol Legend
- Hydraulic Symbols Legend
- Limit Switch Location Legend
- Electrical Schematics – Options
- Power Cable Wiring Diagram
- Drive Contactor Panel Wiring Diagram
- Manifold and Limit Switch Wiring Diagram
- LVI/BCI Option Wiring Diagram
- Charger Interlock Option
- CTE Option, (CE Models)
- Hydraulic Schematics
- Hydraulic Schematic
- Electrical Schematics – ANSI / CSA / AS Models
- Electrical Schematic, (ANSI / CSA / AS), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA / AS before serial numbers Z3010-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA / AS before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA / AS before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Terminal Strip Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (CE), (before serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Electrical Schematics – ANSI and CSA Models
- Ground Control Box Terminal Strip Wiring Diagram, (ANSI / CSA from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (ANSI / CSA from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (ANSI / CSA), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Electrical Schematics – AS / CE Models
- Ground Control Box Terminal Strip Wiring Diagram, (AS / CE from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Ground Control Box Switch Panel Wiring Diagram, (AS / CE from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
- Platform Control Box Wiring Diagram, (AS / CE), (from serial numbers Z30N10-12119, Z34N10-8857 and Z3410-7774)
Z-30/20N
Table of contents
- Introduction
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- B Machine Specifications
- B Manifold Component Specifications
- Pre-Delivery Preparation
- Maintenance Inspection Report
- A-1 Perform Pre-operation Inspection
- A-3 Perform 30 Day Service
- B-1 Check the Batteries
- B-2 Inspect the Electrical Wiring
- B-3 Test the Key Switch
- B-5 Confirm the Proper Brake Configuration
- B-7 Test the Ground Control Override
- B-9 Test the Drive Brakes
- B-11 Test the Drive Speed - Raised or Extended Position
- B-13 Test the Turntable Rotation Stop
- B-14 Check the Electrical Contactors
- C-1 Grease the Platform Overload Mechanism (if equipped)
- D-1 Check the Primary Boom Wear Pads
- D-2 Check the Free-wheel Configuration
- D-3 Check the Turntable Rotation Bearing Bolts
- D-4 Replace the Drive Hub Oil
- D-6 Calibrate the Platform Overload System (if equipped)
- E-1 Test or Replace the Hydraulic Oil
- E-2 Grease the Steer Axle Wheel Bearings
- Controllers
- Platform Leveling Slave Cylinder
- Platform Rotator
- Jib Boom
- Jib Boom Bell Crank (models without rotating jib boom)
- Jib Boom Rotator (models with rotating jib boom)
- Jib Boom Lift Cylinder
- Cable Track
- Primary Boom Lift Cylinder
- Extension Cylinder
- Platform Leveling Master Cylinder
- Secondary Boom
- Secondary Boom Lift Cylinder
- Auxiliary and Function Pump
- Function Manifold Components
- Valve Adjustments - Function Manifold
- Jib Boom and Platform / Jib Boom Rotate Manifold Components
- Valve Coils
- Turntable Rotation Hydraulic Motor
- Hub and Bearings
- Motor Controller
Z-30/20N
Table of contents
- Introduction
- Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N Part
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- C Machine Specifications
- Performance Specifications
- Hydraulic Oil Specifications
- Manifold Component Specifications
- Hydraulic Hose and Fitting Torque Specifications
- Pre-Delivery Preparation
- Maintenance Inspection Report
- A-1 Inspect the Manuals and Decals
- A-2 Perform Pre-operation Inspection
- A-4 Perform 30 Day Service
- A-6 Replace the Drive Hub Oil
- B-2 Inspect the Electrical Wiring
- B-3 Test the Key Switch
- B-5 Confirm the Proper Brake Configuration
- B-6 Check the Oil Level in the Drive Hubs and Mounting Bolt Torque
- B-8 Test the Platform Self-leveling
- B-10 Test the Drive Speed - Stowed Position
- B-12 Test the Alarm Package (if equipped)
- B-13 Test the Turntable Rotation Stop
- B-15 Perform Hydraulic Oil Analysis
- C-1 Grease the Platform Overload Mechanism (if equipped)
- D-1 Check the Primary Boom Wear Pads
- D-2 Check the Free-wheel Configuration
- D-3 Check the Turntable Rotation Bearing Bolts
- D-4 Replace the Drive Hub Oil
- D-6 Inspect for Turntable Bearing Wear
- E-1 Test or Replace the Hydraulic Oil
- E-2 Grease the Steer Axle Wheel Bearings
- Controllers
- Platform Leveling Slave Cylinder
- Platform Rotator
- Platform Overload System (if equipped)
- Jib Boom
- Jib Boom Bell Crank (models without rotating jib boom)
- Jib Boom Rotator (models with rotating jib boom)
- Jib Boom Lift Cylinder
- Cable Track
- Primary Boom Lift Cylinder
- Extension Cylinder
- Platform Leveling Master Cylinder
- Secondary Boom
- Secondary Boom Lift Cylinder
- Auxiliary and Function Pump
- Function Manifold Components
- Valve Adjustments - Function Manifold
- Jib Boom and Platform / Jib Boom Rotate Manifold Components
- Valve Coils
- Turntable Rotation Hydraulic Motor
- Hub and Bearings
- Motor Controller
- Fault Code Chart
manualsdatabase
Your AI-powered manual search engine