Contents - Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Overview
- Product documentation, M2000/M2000A
- Product documentation, M2004
- How to read the product manual
- Safety
- General safety information
- Safety risks
- Safety risks related to tools/workpieces
- Safety risks related to pneumatic/hydraulic systems
- Safety risks during operational disturbances
- Risks associated with live electric parts
- Safety actions
- Fire extinguishing
- Emergency release of the robot's arm
- Brake testing
- Risk of disabling function "Reduced speed 250 mm/s
- Safe use of the FlexPendant
- Work inside the manipulator's working range
- Signal lamp (optional)
- Translate the information on safety and information labels
- Safety related instructions
- DANGER - Moving manipulators are potentially lethal
- DANGER - First test run may cause injury or damage
- WARNING - The brake release buttons may be jammed after service work
- WARNING - The unit is sensitive to ESD
- WARNING - Safety risks during work with gearbox oil
- Installation and commissioning
- Unpacking
- Working range and type of motion
- Risk of tipping / stability
- On-site installation
- Lifting robot with roundslings
- Lifting robot with lifting slings
- Manually releasing the brakes
- Lifting the base plate
- Securing the base plate
- Orienting and securing the robot
- Fitting equipment on robot
- Installation of base spacers (option)
- Installation of cooling fan for motors, axes 1-3 (option)
- Loads
- Restricting the working range
- Mechanically restricting the working range of axis 1
- Mechanically restricting the working range of axis 2
- Mechanically restricting the working range of axis 3
- Installation of position switches (option)
- Electrical connections
- Making robot ready for operation (Foundry Prime)
- Commissioning (Foundry Prime)
- Maintenance
- Maintenance schedule and expected component life
- Maintenance schedule
- Expected component life
- Inspection activities
- Inspection, oil level gearbox axis 2
- Inspection, oil level gearbox axis 3
- Inspection, oil level gearbox axis 4
- Inspection, oil level, gearbox axis 5
- Inspection, oil level gearbox axis 6
- Inspection, balancing device
- Inspection, cable harness
- Inspection, information labels
- Inspection, mechanical stop, axis 1
- Inspection, additional mechanical stops
- Inspection, damper axes 2-5
- Inspection, position switch axes 1, 2 and 3
- Inspection, signal lamp
- Inspection of air hoses (Foundry Prime)
- Replacement/changing activities
- Oil change, gearbox axis 1
- Oil change, gearbox axis 2
- Oil change, gearbox, axis 3
- Oil change, gearbox, axis 4
- Oil change, gearbox, axis 5
- Oil change, gearbox axis 6
- Replacement of SMB battery
- Lubrication activities
- Rust preventive, bearing axis 1 (Foundry Prime)
- Rust preventive, bearing axis 4 (Foundry Prime)
- Rust preventive, support bearing in wrist (Foundry Prime)
- Cleaning activities
- Service Information System, M2000
- Description of Service Information System (SIS)
- SIS system parameters
- Setting the SIS parameters
- Reading the SIS output logs
- Exporting the SIS data
- Repair
- General procedures
- Mounting instructions for bearings
- Mounting instructions for seals
- Complete robot
- Replacement of cable harness, axes 1-4
- Replacement of cable harness, axes 5-6
- Replacement of cabling, axis 5 motor
- Replacement of complete arm system
- Replacement of air nipple and hose (Foundry Prime)
- Upper and lower arm
- Replacement of complete wrist unit
- Replacement of upper arm
- Replacement of complete lower arm
- Replacement of lower arm shaft
- Securing the lower arm
- Frame and base
- Replacement of brake release unit
- Replacement of spherical roller bearing, balancing device
- Replacement of balancing device
- Unloading the balancing device
- Restoring the balancing device
- Motors
- Replacement of motor axis 2
- Replacement of motor, axis 3
- Replacement of motor, axis 4
- Replacement of motor, axis 5
- Replacement of motor, axis 6
- Gearboxes
- Replacement of gearbox axis 2
- Replacement of gearbox, axis 3
- Replacement of gearbox, axis 6
- Calibration information
- Calibration methods
- Calibration scales and correct axis position
- Calibration movement directions for all axes
- Updating revolution counters
- Checking the calibration position
- Additional calibration instruction, IRB4400
- Decommissioning
- Decommissioning of balancing device
- Reference information
- Applicable Safety Standards
- Unit conversion
- Screw joints
- Weight specifications
- Standard toolkit
- Special tools
- Lifting equipment and lifting instructions
- Spare part / part list
- Spare part list
- Part list
- Rebuilding parts
- Part list, overview
- Base incl frame ax 1
- Axis 3-4
- Axis 3-4, Foundry
- Axis 3-4 Foundry Prime
- Wrist, type 2, standard
- Wrist, type 2, Foundry
- Wrist, type 2, insulated
- Wrist, type 2, Foundry Prime
- Material set, manipulator, 3HAC 13263-1
- Material set, axis 1-2, 3HAC 13264-1
- Material set, balancing device, 3HAC 13265-1
- Arm extension set, 450 mm, 3HAC 12311-5
- Exploded views
- Base incl. Frame
- Frame - lower arm 1
- Frame - lower arm 2
- Upper arm
- Wrist complete
- Circuit Diagram
- Circuit diagram 3HAC 025744-001
|
How to read the product manual153HAC020993-001 Revision: G© Copyright 2004-2008 ABB. All rights reserved.How to read the product manualReading the proceduresThe procedures contain references to figures, tools, material etc. The references are read asdescribed below.References to figuresThe procedures often include references to components or attachment points located on therobot/controller. The components or attachment points are marked with italic text in theprocedures and completed with a reference to the figure where the current component orattachment point is shown.The denomination in the procedure for the component or attachment point corresponds to thedenomination in the referenced figure.The table below shows an example of a reference to a figure from a step in a procedure.References to required equipmentThe procedures often include references to equipment (spare parts, tools etc.) required for thedifferent actions in the procedure. The equipment is marked with italic text in the proceduresand completed with a reference to the section where the equipment is listed with furtherinformation, i.e. article number, dimension.The denomination in the procedure for the component or attachment point corresponds to thedenomination in the referenced list.The table below shows an example of a reference to a list of required equipment, from a stepin a procedure.Safety informationThe manual includes a separate safety chapter that must be read through before proceedingwith any service or installation procedures. All procedures also include specific safetyinformation when dangerous steps are to be performed.Read more in chapter Safety on page 17.Action Note/Illustration8. Remove the rear attachment screws, gearbox. Shown in the figure Location ofgearbox on page xx.Action Note/Illustration3. Fit a new sealing, axis 2 to the gearbox. Art. no. is specified in Requiredequipment on page xx.
PreviousNext |