ABB IRB 6650S - 125/3.5 manuals
IRB 6650S - 125/3.5
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Overview
- Product documentation, M2000/M2000A
- Product documentation, M2004
- How to read the product manual
- Safety
- General safety information
- Safety risks
- Safety risks related to tools/workpieces
- Safety risks related to pneumatic/hydraulic systems
- Safety risks during operational disturbances
- Risks associated with live electric parts
- Safety actions
- Fire extinguishing
- Emergency release of the robot's arm
- Brake testing
- Risk of disabling function "Reduced speed 250 mm/s
- Safe use of the FlexPendant
- Work inside the manipulator's working range
- Signal lamp (optional)
- Translate the information on safety and information labels
- Safety related instructions
- DANGER - Moving manipulators are potentially lethal
- DANGER - First test run may cause injury or damage
- WARNING - The brake release buttons may be jammed after service work
- WARNING - The unit is sensitive to ESD
- WARNING - Safety risks during work with gearbox oil
- Installation and commissioning
- Unpacking
- Working range and type of motion
- Risk of tipping / stability
- On-site installation
- Lifting robot with roundslings
- Lifting robot with lifting slings
- Manually releasing the brakes
- Lifting the base plate
- Securing the base plate
- Orienting and securing the robot
- Fitting equipment on robot
- Installation of base spacers (option)
- Installation of cooling fan for motors, axes 1-3 (option)
- Loads
- Restricting the working range
- Mechanically restricting the working range of axis 1
- Mechanically restricting the working range of axis 2
- Mechanically restricting the working range of axis 3
- Installation of position switches (option)
- Electrical connections
- Making robot ready for operation (Foundry Prime)
- Commissioning (Foundry Prime)
- Maintenance
- Maintenance schedule and expected component life
- Maintenance schedule
- Expected component life
- Inspection activities
- Inspection, oil level gearbox axis 2
- Inspection, oil level gearbox axis 3
- Inspection, oil level gearbox axis 4
- Inspection, oil level, gearbox axis 5
- Inspection, oil level gearbox axis 6
- Inspection, balancing device
- Inspection, cable harness
- Inspection, information labels
- Inspection, mechanical stop, axis 1
- Inspection, additional mechanical stops
- Inspection, damper axes 2-5
- Inspection, position switch axes 1, 2 and 3
- Inspection, signal lamp
- Inspection of air hoses (Foundry Prime)
- Replacement/changing activities
- Oil change, gearbox axis 1
- Oil change, gearbox axis 2
- Oil change, gearbox, axis 3
- Oil change, gearbox, axis 4
- Oil change, gearbox, axis 5
- Oil change, gearbox axis 6
- Replacement of SMB battery
- Lubrication activities
- Rust preventive, bearing axis 1 (Foundry Prime)
- Rust preventive, bearing axis 4 (Foundry Prime)
- Rust preventive, support bearing in wrist (Foundry Prime)
- Cleaning activities
- Service Information System, M2000
- Description of Service Information System (SIS)
- SIS system parameters
- Setting the SIS parameters
- Reading the SIS output logs
- Exporting the SIS data
- Repair
- General procedures
- Mounting instructions for bearings
- Mounting instructions for seals
- Complete robot
- Replacement of cable harness, axes 1-4
- Replacement of cable harness, axes 5-6
- Replacement of cabling, axis 5 motor
- Replacement of complete arm system
- Replacement of air nipple and hose (Foundry Prime)
- Upper and lower arm
- Replacement of complete wrist unit
- Replacement of upper arm
- Replacement of complete lower arm
- Replacement of lower arm shaft
- Securing the lower arm
- Frame and base
- Replacement of brake release unit
- Replacement of spherical roller bearing, balancing device
- Replacement of balancing device
- Unloading the balancing device
- Restoring the balancing device
- Motors
- Replacement of motor axis 2
- Replacement of motor, axis 3
- Replacement of motor, axis 4
- Replacement of motor, axis 5
- Replacement of motor, axis 6
- Gearboxes
- Replacement of gearbox axis 2
- Replacement of gearbox, axis 3
- Replacement of gearbox, axis 6
- Calibration information
- Calibration methods
- Calibration scales and correct axis position
- Calibration movement directions for all axes
- Updating revolution counters
- Checking the calibration position
- Additional calibration instruction, IRB4400
- Decommissioning
- Decommissioning of balancing device
- Reference information
- Applicable Safety Standards
- Unit conversion
- Screw joints
- Weight specifications
- Standard toolkit
- Special tools
- Lifting equipment and lifting instructions
- Spare part / part list
- Spare part list
- Part list
- Rebuilding parts
- Part list, overview
- Base incl frame ax 1
- Axis 3-4
- Axis 3-4, Foundry
- Axis 3-4 Foundry Prime
- Wrist, type 2, standard
- Wrist, type 2, Foundry
- Wrist, type 2, insulated
- Wrist, type 2, Foundry Prime
- Material set, manipulator, 3HAC 13263-1
- Material set, axis 1-2, 3HAC 13264-1
- Material set, balancing device, 3HAC 13265-1
- Arm extension set, 450 mm, 3HAC 12311-5
- Exploded views
- Base incl. Frame
- Frame - lower arm 1
- Frame - lower arm 2
- Upper arm
- Wrist complete
- Circuit Diagram
- Circuit diagram 3HAC 025744-001
Related products
IRB 6650S-125/3.5IRB 6650 - 125/3.2IRB 6650SIRB 6650S-90/3.9IRB 6650S - 90/3.9IRB 6650S - 200/3.0IRB 6650S-200/3.0IRB 6650 - 125/3.2 type BIRB 5720-125/3.0IRB 6650ABB categories
Industrial Equipment
DC Drives
Controller
Relays
Measuring Instruments
Circuit breakers
Battery Charger
Industrial Electrical
Transformer
Switch
manualsdatabase
Your AI-powered manual search engine