15 Security142 Xerox WorkCentre 4250/4260 Series System Administration GuideScheduled On Demand Image Overwrite1. At your Workstation, open the web browser, enter the TCP/IP Address of the machinethat you wish to copy the cloned settings to, in the Address bar.2. Press [Enter].3. Click on the [Properties] tab.4. Click on the [Security] link.5. Click on the [On Demand Image Overwrite] link.6. Click on [Scheduled] in the directory tree.7. Select either [Standard Overwrite] or [Full Overwrite] depending on the overwriteyou want to perform.8. Select either [Daily], [Weekly] or [Monthly] from the Frequency drop-down menu tospecify the frequency for the overwrite.9. If you select [Daily] overwrites, enter the time of the day that you want the overwriteto happen.10. If you select [Weekly] overwrites, select the which day of the week and the time ofthe day you want the overwrite to happen.11. If you select [Monthly] overwrites, select the day of the month and the time of theday you want the overwrite to happen.12. Click on the [Apply] button. The machine will be taken offline at the day or timespecified to perform the overwrite.Immediate Image OverwriteOverviewImmediate Image Overwrite (IIO) provides a facility to overwrite jobs from the image diskin the same way as On Demand Image Overwrite. However, IIO performs an overwrite on ajob by job basis, immediately after each job has been processed. For machines with networkconnectivity, all jobs that pass through the machine are immediately overwritten. Formachines without network connectivity and which have Embedded Fax installed, all fax jobsare immediately overwritten.NOTE: Copy jobs are not stored on the machine's image disk in the same way as othertypes of jobs, so they do not need to be overwritten.Once enabled, the feature becomes immediately operational and requires no configurationby the System Administrator.Information ChecklistBefore starting the Installation procedure, please ensure that the following item or task isavailable or has been performed: