Eaton Power Xpert 9395C UPS Installation and Operation Manual 164000821—Rev 06 11CChhaapptteerr 33 UUPPSS IInnssttaallllaattiioonn PPllaann aanndd UUnnppaacckkiinnggUse the following basic sequence of steps to install the UPS:1. Create an installation plan for the UPS system (Chapter 32. Prepare your site for the UPS system (Chapter 3).3. Inspect and unpack the UPS sections (Chapter 3).4. Unload and install the UPS sections and wire the system (Chapter 4 UPS System Installation).5. Install features, accessories, or options, as applicable (Chapter 5 Installing Options and Accessories).6. Complete the Installation Checklist (Chapter 4 UPS System Installation).7. Have authorized service personnel perform preliminary operational checks and start up the system.NOTE Startup and operational checks must be performed by an authorized Eaton CustomerService Engineer, or the warranty terms specified in 1.8 Warranty become void. Thisservice is offered as part of the sales contract for the UPS. Contact an Eaton servicerepresentative in advance (usually a two-week notice is required) to reserve a preferredstartup date.33..11 CCrreeaattiinngg aann IInnssttaallllaattiioonn PPllaannBefore installing the UPS system, read and understand how this manual applies to the system being installed.Use the procedures and illustrations in paragraph 3.2 Preparing the Site and Chapter 4 UPS System Installationto create a logical plan for installing the system.33..22 PPrreeppaarriinngg tthhee SSiitteeFor the UPS system to operate at peak efficiency, the installation site should meet the environmentalparameters outlined in this manual. If the UPS is to be operated at an altitude higher than 1000 m (3300 ft),contact an Eaton service representative for important information about high altitude operation. The operatingenvironment must meet the weight, clearance, and environmental requirements specified.33..22..11 GGeenneerraall SSttoorraaggee RReeqquuiirreemmeennttss ffoorr UUPPSS EEqquuiippmmeenntt• Equipment which cannot be immediately installed and energized should be stored in an indoor, dry, clean,ventilated area, heated environment (i.e. an temperature and humidity controlled environment). Thestorage area must be protected from rain, water, chemical agents and gases as shown in .• Do not store in areas where conditions such as dampness, changes in temperature, dust, dirt, rubble,paint, conductive particulates, or corrosive atmosphere / gases are present.• Storage temperature: -25 °C to +60 °C (-13 °F to 140 °F).• Factory installed packaging and wrapping of the equipment should not be removed until equipment isready to install.• Equipment should be checked periodically for any signs of deterioration. It is the responsibility of thereceiving contractor to ensure protection during storage.• Equipment should be placed on true and solid level surfaces for storage.• Have a plan for condensation and environmental mitigation prior to equipment arrival.