78 Eaton Power Xpert 9395C UPS Installation and Operation Manual 164000821—Rev 063. Securely mount the SCM II at the desired location. See Figure 52 for mounting hole locations.NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installedbetween the device and the UPS cabinet.4. Remove the ISBM cabinet top right interface conduit landing plate to drill or punch conduit holes (seeFigure 27).5. Reinstall the conduit landing plate.6. Install conduit between the UPS and SCM II. See Figure 52 for SCM II knockout hole location.7. Install wiring between the UPS and SCM II. See Figure 42 and Table 17 for the Powerware Hot Sync CANBridge Card terminal location and wiring information, and Figure 48, Figure 46, and Table 21 for the SCM IIterminal location and wiring information.NOTE 120 Vac for the RMP II should be supplied from the critical bus by facility planners or thecustomer.8. Install 120 Vac power wiring from the critical bus to the SCM II. See Figure 48, Figure 46, and Table 21 forthe terminal location and wiring informationNOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by anauthorized Eaton Customer Service Engineer. Contact an Eaton service representativeto schedule a date.9. Close the front door and secure the latch.10. Restart the UPS. See Chapter 7 UPS Operating Instructions for startup instructions.Figure 45. Remote Monitor Panel II and Remote Monitor Panel II Terminal LocationsTerminal TB1Signal Connectionsfrom the UPSGroundTerminalTerminal TB3120 Vac PowerInstalling Options and Accessories