Eaton Power Xpert 9395C UPS Installation and Operation Manual 164000821—Rev 06 1333..22..33 IInnssttaallllaattiioonn CCoonnssiiddeerraattiioonnssThe UPS system installation must meet the following guidelines:• The system must be installed on a level floor suitable for computer or electronic equipment.• The system must be installed in a temperature and humidity controlled indoor area free of conductivecontaminants.Failure to follow guidelines may void your warranty.The UPS equipment operating environment must meet the weight requirements shown in Table 2 and the sizerequirements shown in Figure 2 through Figure 10 . Dimensions are in millimeters (inches).Table 2 includes the weights of the heaviest cabinet configuration. Actual weights may be less due to theinstalled configuration. Weights are in kilograms (pounds).Table 2. UPS Cabinet Maximum WeightsModel Section Maximum Weightkg (lb)Shipping InstalledEaton 9395C-1000/1000 UPS (Total) 2539.8 (5599) 2401.8 [5295]Eaton 9395C-1000/1100 ISBM 817.4 (1802) 773.4 (1705)Eaton 9395C-1100/1100 PM 1722.4 (3797) 1628.4 (3590)NOTE Table 5 describes power ratingsThe UPS cabinets use forced air cooling to regulate internal component temperature. Air inlets are in the frontof the cabinet and outlets are in the top. Allow clearance in front of and above each cabinet for proper aircirculation. The clearances required around the UPS cabinet are shown in Table 3.Dimensions are in millimeters (inches).Table 3. UPS Cabinet ClearancesFrom Top of Cabinet 457.2 mm (18”) minimum clearance for ventilationFrom Front of Cabinet 914.4 mm (36”) working spaceFrom Back of Cabinet None RequiredFrom Right Side of Cabinet None RequiredFrom Left Side of Cabinet None RequiredThe basic environmental requirements for operation of the UPS are:• Recommended Operating Range: 20–25ºC (68–77ºF)• Maximum Relative Humidity: 95%, non-condensingUPS Installation Plan and Unpacking