Eaton Power Xpert 9395C UPS Installation and Operation Manual 164000821—Rev 06 79Figure 46. Remote Monitor Panel II, Relay Interface Module II, or Supervisory Contact Module II WiringUPS Can Card J3120 Vac fromCritical BusLineNeutralTwisted PairGround TerminalRMP II, RIM II, or SCM IITable 21. RMP II, RIM II, or SCM II Wiring TerminationsFromUPS CAN CardToRMP II, RIM II, or SCM IITightening TorqueNm (lb in)RemarksJ3–6 (TX ) TB1–5 (RDX*) 0.9 (8) Use twisted pairJ3–7 (TX) TB1–4 (RDX) 0.9 (8)N/A TB3 Line 0.9 (8)N/A TB3 Neutral 0.9 (8)N/A Ground Terminal 2.7 (24) MaximumNOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by anauthorized Eaton Customer Service Engineer. Contact an Eaton service representativeto schedule a date.11. To check the operation of the RMP II, ensure that the UPS is supplying the load via inverter or bypass. Ifthe indicators on the RMP II show the appropriate status, then it is operating correctly.If the communication link between the UPS and the RMP II is not present, the RMP II performs a self-test(all indicators flash and the horn beeps at one-second intervals). If the self-test occurs, check all harnessconnectors and the fuse for proper seating. If all connections are secure but the RMP II continues to self-test, replace the fuse with the spare included in the hardware kit. If a fuse replacement does not correctthe problem, contact an Eaton service representative for verification that the RMP II is working correctly.12. To test the indicator lamps, press and hold the horn silence pushbutton for three seconds. All lamps shouldilluminate, and the horn sounds continuously until you release the pushbutton.Installing Options and Accessories