24 Eaton Power Xpert 9395C UPS Installation and Operation Manual 164000821—Rev 06Table 8. External Power Cable TerminationsTerminal Function Terminal Function Bus Landings(using both sides of bus)Tightening TorqueNm (lb ft) Bolt SizeAC Input to UPSRectifierE1 Phase A 6 – 2 bolt mounting 76 (56) M12E2 Phase B 6 – 2 bolt mounting 76 (56) M12E2 Phase C 6 – 2 bolt mounting 76 (56) M12AC Input to BypassE6 Phase A 6 – 2 bolt mounting 76 (56) M12E7 Phase B 6 – 2 bolt mounting 76 (56) M12E8 Phase C 6 – 2 bolt mounting 76 (56) M12AC Output to CriticalLoadE9 Phase A 6 – 2 bolt mounting 76 (56) M12E10 Phase B 6 – 2 bolt mounting 76 (56) M12E11 Phase C 6 – 2 bolt mounting 76 (56) M12DC Input fromBattery or BatteryDisconnect to UPSE4Battery (+) 16 – 2 bolt mounting 76 (56) M12E5 Battery (-) 16 – 2 bolt mounting 76 (56) M12NOTE Customer ground, sized in accordance with NEC Table 250.122, can be run in any conduit listed in Table 11.Table 9. Supplied External Wiring Terminal Hardware KitPart Size Quantity Terminals Used On Eaton Part NumberBolt, Grade 5 M10 x 40 mm 30 Ground and Neutral 180190078-088Bolt, Grade 5 M12 x 50 mm 86 Rectifier Input, Bypass Input, BatteryInput, and Output180190078-115Flat Washer M12 52 Rectifier Input, Bypass Input, BatteryInput, and Output180500036-120ConicalWasherM12 26 Rectifier Input, Bypass Input, BatteryInput, and Output180500037-120Nut M12 26 Rectifier Input, Bypass Input, BatteryInput, and Output180200001-07Table 10. Recommended Installation Parts and Tools (Not Supplied by Eaton)Part Size Quantity Manufacturer Part Number NotesLong Barrel 2-Hole Lug2/0 AWG Thomas & Betts 54862BECopper wireonly3/0 AWG Thomas & Betts 54864BE4/0 AWG Thomas & Betts 54866BE250 MCM As required Thomas & Betts 54868BE300 MCM Thomas & Betts 54870BEUPS Installation Plan and Unpacking