3-5-9. REPLACEMENT OF THE REELUNIT1. Remove 6 screws (L) and carefully lift the DD ReelUnit.2. Disconnect a connector.SCREWS (L)CONNECTORFigure M18-A3. The Reel Motor Unit can be re-installed byreversing the removal procedure.MAIN ROD~ CUT WASHERSFigure M18-BNote: When assembling the DD Reel Motor Unit,side the Main Rod to far left side by rotatinga center Gear.3-5-10. REPLACEMENT OF THE MAINBRAKE (S),(T) UNIT1. Remove the Reel Unit (Refer to Replacement ofthe Reel Unit).2. Remove a Retaining Ring (A).3. Remove the Main Brake (S),(T) with a spring.RETAINING RING (A)BRAKE SOLENOIDFigure M 194. The new Main Brake (S),(T) Unit can bereinstalled by reversing the removal procedure.Note: When assembling the DD Reel Motor Unit,slide the Main Rod to far left side by rotatinga Center Gear (Figure M19).3-5-11. REPLACEMENT OF THEPRESSURE ROLLER UNIT1. Place the deck in or EJECT mode.2. Remove the Pinch Can Cap.3. Remove the Pressure Roller Unit.PINCH CAM GAPPRESSURE ROLLER UNITFigure M204. The new Pressure Roller Unit can be re-installedby reversing the removal procedure.3-13