Eaton® Power Xpert® 9395P-1200 Installation and Operation Manual 164000500—Rev 11 103Table 32. Pull-Chain Wiring Terminations with MOBsFrom To FunctionUPS 1 CAN Bridge Card J3–1 (Alarm) MOB 1 Aux 1 NC MOB Open AlarmUPS 1 CAN Bridge Card J3–2 (Alarm Return) MOB 1 Aux 1 ComUPS 1 TB2–1 (Pull Chain) MOB 1 Aux 2 NO Pull ChainUPS 2 TB2–2 (Pull Chain Common) UPS 2 TB2–2 (Pull Chain Common) Pull Chain CommonUPS 2 CAN Bridge Card J3–1 (Alarm) MOB 2 Aux 1 NC MOB Open AlarmUPS 2 CAN Bridge Card J3–2 (Alarm Return) MOB 2 Aux 1 ComUPS 2 TB2–1 (Pull Chain) MOB 2 Aux 2 NO Pull ChainUPS 2 TB2–2 (Pull Chain Common) UPS 3 TB2–2 (Pull Chain Common) Pull Chain CommonUPS 3 CAN Bridge Card J3–1 (Alarm) MOB 3 Aux 1 NC MOB Open AlarmUPS 3 CAN Bridge Card J3–2 (Alarm Return) MOB 3 Aux 1 ComUPS 3 TB2–1 (Pull Chain) MOB 3 Aux 2 NO Pull ChainUPS 3 TB2–2 (Pull Chain Common) UPS 4 TB2–2 (Pull Chain Common) Pull Chain CommonUPS 4 CAN Bridge Card J3–1 (Alarm) MOB 4 Aux 1 NC MOB Open AlarmUPS 4 CAN Bridge Card J3–2 (Alarm Return) MOB 4 Aux 1 ComUPS 4 TB2–1 (Pull Chain) MOB 4 Aux 2 NO Pull ChainMOB 1 Aux 2 Com MOB 2 Aux 2 ComPull Chain MOB CommonMOB 2 Aux 2 Com MOB 3 Aux 2 ComMOB 3 Aux 2 Com MOB 4 Aux 2 Com55..33 IInnssttaalllliinngg aann OOppttiioonnaall RReemmoottee MMoonniittoorr PPaanneell IIIITo install RMP II wiring:1. Verify the UPS system is turned off and all power sources are removed. SeeChapter 7 UPS Operating Instructions for shutdown instructions.2. Perform the procedure listed in paragraph5.1 Installing an Optional Powerware Hot Sync CAN Bridge Card.NOTE If mounting to a hollow wall, secure the enclosure to a wood or metal stud within thewall. Do not use hollow wall anchors.3. Securely mount the RMP II at the desired location. See Figure 59 for mounting hole locations.NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installedbetween the device and the UPS cabinet.Installing Options and Accessories