30 Eaton® Power Xpert® 9395P-1200 Installation and Operation Manual 164000500—Rev 11Table 8. 480V Input/Output Ratings and External Wiring Requirements for the Three UPM – Common BatteryBasic Unit RatingUnits Rating 50/60 HzkVAkW675675750750825825900825900900Input and Output Voltage Volts 480/480 480/480 480/480 480/480 480/480AC Input to UPS Rectifier (0.98 Minimum pF)Full load current plus battery recharge current(3) Phases, (1) Ground AAmps 1002 1113 1225 1225 1336Minimum Conductor SizeNumber per PhaseAWG or kcmil(each)500(6)500(6)500(6)500(6)500(6)AC Input to UPS BypassFull Load Current(3) Phases, (1) Ground BAmps 812 902 992 1083 1083Minimum Conductor SizeNumber per PhaseAWG or kcmil(each)500(5)500(5)500(5)500(5)500(5)DC Input from Battery Disconnect to UPS(3) Phases, (1) NegativeCTotal Amps 1480 1645 1809 1809 1974Minimum Conductor SizeNumber per PoleAWG or kcmil(each)500(12)500(12)500(12)500(12)500(12)AC Output to Critical LoadFull Load Current(3) Phases, (1) Ground DTotal Amps 812 902 992 1083 1083Minimum Conductor SizeNumber per PhaseAWG or kcmil(each)500(5)500(5)500(5)500(5)500(5)NOTE Callout letters A, B, C, and D map to Figure 68..NOTE If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it mayinterrupt the UPS input neutral during its transition between sources. For the 9395 UPS:The ATS transition must be open in both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS tooperate properly, however it is important to evaluate whether the critical load will function properly as its neutral reference israpidly (50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, willinterrupt the return current path and cause a loss of all phase-to-neutral loads.If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during thetransition.UPS Installation Plan and Unpacking