Eaton® Power Xpert® 9395P-1200 Installation and Operation Manual 164000500—Rev 11 6115. In the ISBM section (see A in Figure 30), locate the coiled wiring harnesses with the J50, J51, J61, and J70connectors attached. Remove the wire ties securing the harnesses and carefully remove the harnessesfrom the protective cage. If necessary, loosen the screws securing the protective cage.16. Locate the mating P50 connector in the UPM section wireway (see B in Figure 28) and connect the P50connector to the J50 connector.17. Locate the mating P51 connector in the UPM section wireway (see B in Figure 28) and connect the P51connector to the J51 connector.18. Locate the mating P61 connector in the UPM section wireway (see B in Figure 28) and connect the P61connector to the J61 connector.19. Locate the mating P70 connector in the UPM section wireway (see B in Figure 28) and connect the P70connector to the J70 connector.NOTE One intercabinet interface cable is supplied coiled against the left side panel of the UPMsection (see B in Figure 28).20. In the UPM section (see B in Figure 28), locate the coiled RJ-45 CAN cable. Remove the wire ties securingthe cable to the interior left side panel of the UPM section. Route this cable through the round wiringaccess in the right side panel of the ISBM section (see B in Figure 28).21. In the ISBM section, locate the J39 inverter CAN connector on the Pl1 interface board and connect the RJ-45 CAN cable connector to the J39 connector (see Figure 29 and Figure 30).22. Dress the interface harnesses and secure in place with wire ties as necessary to prevent wire damage.23. When all wiring is complete, reinstall the safety shield panels removed in previous steps.24. Reinstall the front wireway panel.25. If installing a four UPM UPS, proceed to paragraph 4.5 Field Installed UPM Installation; otherwise, proceedto Step 26.26. If installing a battery system, proceed to paragraph 4.6 Battery System Installation; otherwise, proceed toStep 27.27. If installing a tie cabinet or distribution panel for a distributed bypass system, proceed to paragraph4.7 Distributed Bypass Tie Cabinet Installation; otherwise, proceed to paragraph4.8 Installing UPS External and Battery Power WiringUPS System Installation