60 Eaton® Power Xpert® 9395P-1200 Installation and Operation Manual 164000500—Rev 115. Locate the 1G1, 1G2, 2G1, 2G2, 3G1, and 3G2 power wiring harnesses. Route these harnesses throughthe wiring access in the right side panel of the ISBM section to the AC Input to UPMs terminals. SeeFigure 24 for terminal locations.NOTE Two cable lugs will be connected to each terminal stud. When connecting the cablelugs, install the first lug on the stud with the raised barrel portion facing the back of thecabinet. Install the second lug with the raised barrel portion facing the front of thecabinet.6. Locate the intercabinet wiring terminal hardware kit packed on the bottom right side of the ISBM section.7. Using hardware from the intercabinet wiring terminal hardware kit (see Table 17), connect phase A, B, andC cable lug connections to the AC Input to UPMs terminals. Follow the callout details in Figure 25 toconnect the correct cable lug to the proper terminals. See paragraph3.2.4 UPS System Power Wiring Preparation for wiring and termination requirements.8. Locate the 1G3, 2G3, and 3G3 power wiring harnesses. Route these harnesses through the wiring accessin the right side panel of the ISBM section to the DC Input to UPMs terminals. See Figure 24 for terminallocations.NOTE When connecting the UPM battery cables, verify the cables are connected to the correctterminals.9. Using hardware from the intercabinet wiring terminal hardware kit (see Table 17), connect the positive andnegative cable lug connections to the DC Input to UPMs terminals. Follow the callout details in Figure 26to connect the correct cable lug to the proper terminals. See paragraph3.2.4 UPS System Power Wiring Preparation for wiring and termination requirements.NOTE AC output intercabinet power wiring harnesses are supplied attached to the interior leftside panel of the UPM section (see Figure 21).10. Locate the 1G4, 1G5, 2G4, 2G5, 3G4, and 3G5 power wiring harnesses. Remove the front two columns ofwire ties securing the cables to facilitate routing cables to the AC Output from UPMs terminals. SeeFigure 24 for terminal locations.NOTE Two cable lugs will be connected to each terminal stud. When connecting the cablelugs, install the first lug on the stud with the raised barrel portion facing the back of thecabinet. Install the second lug with the raised barrel portion facing the front of thecabinet.11. Using hardware from the intercabinet wiring terminal hardware kit (see Table 17), connect phase A, B, andC cable lug connections to the AC Output from UPMs terminals. Follow the callout details in Figure 27 toconnect the correct cable lug to the proper terminals. See paragraph3.2.4 UPS System Power Wiring Preparation for wiring and termination requirements.12. Install the remaining hardware (three washers, conical washers, and nuts) onto the AC Input to UPMsterminals designated for the four UPM model and secure the hardware (see ). This hardware is used by anEaton Customer Service Engineer to install a Field Installed UPM (FI-UPM).13. Locate the ground braid in the bottom left front corner of the UPM section. The ground braid is secured atthe factory to the UPM section ground bolt. Route the ground braid through the wiring access in the rightside panel of the ISBM section to the ground bolt in the ISBM section.14. Connect the ground braid to the ISBM section ground bolt and secure.NOTE Four intercabinet interface wiring harnesses are supplied coiled inside the protectivecage on the right side panel of the ISBM section (see A in Figure 28).UPS System Installation