40 Eaton® Power Xpert® 9395P-1200 Installation and Operation Manual 164000500—Rev 11Table 18. UPS External Power Cable Terminations for Three/Four UPM Models (Continued)Terminal Function Terminal Function Bus Landings (usingboth sides of bus)Tightening TorqueNm (lb ft) Bolt SizeDC Input from Battery orBattery Disconnect to UPS– Separate Battery(UPM 4 FI-UPM)E4 Battery (+) 4 – 2 bolt mounting 76 (56) M12E5 Battery (-) 4 – 2 bolt mounting 76 (56) M12Input and Output Neutral E12 Neutral 12 – 2 bolt mounting 76 (56) M12Customer Ground Ground Ground 15 – 2 bolt mounting 76 (56) M12NOTE Customer ground, sized in accordance with NEC Table 250.122, can be run in any conduit listed in Table 21.NOTE Bypass terminations are not applicable to IOM configurations.Table 19. Supplied External Wiring Terminal Hardware KitPart Size Quantity Terminals Used On Eaton Part NumberBolt, Grade 5 M12 x 40 mm 30 Ground and Neutral 180190078-112Bolt, Grade 5 M12 x 50 mm 86 Rectifier Input, Bypass Input, Battery Input, andOutput180190078-115Flat Washer M12 202 Rectifier Input, Bypass Input, Battery Input,Output, and Ground180500036-120ConicalWasherM12 116 Rectifier Input, Bypass Input, Battery Input,Output, and Ground180500037-120Nut M12 86 Rectifier Input, Bypass Input, Battery Input,Output, and Ground180200001-07NOTE Bypass terminations are not applicable to IOM configurations.Table 20. Recommended Installation Parts and Tools (Not Supplied by Eaton)Part Size Quantity Manufacturer Part Number NotesLong Barrel 2-Hole Lug2/0 AWGAs requiredThomas & Betts 54862BECopper wireonly3/0 AWG Thomas & Betts 54864BE4/0 AWG Thomas & Betts 54866BE250 MCM Thomas & Betts 54868BE300 MCM Thomas & Betts 54870BE350 MCM Thomas & Betts 54872BE400 MCM Thomas & Betts 54874BE500 MCM Thomas & Betts 54876BEManual Hydraulic Crimp Tool 14 Ton 1 Thomas & Betts TBM14MDie Set N/A 1 Thomas & Betts 15506UPS Installation Plan and Unpacking