28 Eaton® Power Xpert® 9395P-1200 Installation and Operation Manual 164000500—Rev 11Table 6. 480V Input/Output Ratings and External Wiring Requirements for the Four UPM – Common BatteryBasic Unit RatingUnits Rating 50/60 HzkVAkW10001000110011001200110012001200Input and Output Voltage Volts 480/480 480/480 480/480 480/480AC Input to UPS Rectifier (0.98 Minimum pF)Full load current plus battery recharge current(3) Phases, (1) Ground AAmps 1485 1600 1600 1781Minimum Conductor SizeNumber per PhaseAWG or kcmil(each)500(5)500(6)500(6)500(6)AC Input to UPS BypassFull Load Current(3) Phases, (1) Ground BAmps 1203 1323 1443 1443Minimum Conductor SizeNumber per PhaseAWG or kcmil(each)500(5)500(5)500(5)500(5)DC Input from Battery Disconnect to UPS(1) Positive, (1) NegativeCTotal Amps 2193 2412 2412 2632Minimum Conductor SizeNumber per Pole(1) Positive, (1) NegativeAWG or kcmil(each) 500(10)500(12)500(12)500(12)AC Output to Critical LoadFull Load Current(3) Phases, (1) Ground DAmps 1203 1323 1443 1443Minimum Conductor SizeNumber per PhaseAWG or kcmil(each)500(5)500(5)500(5)500(5)NOTE Callout letters A, B, C, and D map to Figure 66.NOTE Bypass wiring data is not applicable to IOM configurations.Battery Conductor Sizing: Eaton strongly recommends using the specified DC conductor size and quantity shown above foroptimum system performance and battery run time.Battery Cable Routing RequirementsConduit applications:* Each conduit must have a Positive, Negative, and Ground conductor.* There must be an equal number of positive and negative conductors in a single conduit. Only one ground conductor is required ineach conduit.Raceway applications:* Positive and negative battery cables must be run side by side in the raceway in an alternating pattern (+ - + - + - + -).* There must be a ground cable running in the raceway with the battery cables.NOTE If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it mayinterrupt the UPS input neutral during its transition between sources. For the 9395 UPS:The ATS transition must be open in both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS tooperate properly, however it is important to evaluate whether the critical load will function properly as its neutral reference israpidly (50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, willinterrupt the return current path and cause a loss of all phase-to-neutral loads.If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during thetransition.UPS Installation Plan and Unpacking