Eaton® Power Xpert® 9395P-1200 Installation and Operation Manual 164000500—Rev 11 75ATTENTION!Lors de l’évaluation du système de batterie, ne pas dépasser les capacités internes du chargeur de batteries.Se reporter au chapitre Chapter 10 Product Specifications sur les notices techniques pour connaître lestensions maximales du chargeur de batteries.Ne pas installer une armoire endommagée. Signaler lesdommages au transporteur et communiquer avec un représentant du service Eaton immédiatement.To install wiring to connections:NOTE An installed FI-UPM is always designated as UPM 4.NOTE Battery Cable Routing Requirements using Conduit:• * Each conduit must have a Positive, Negative, and Ground conductor• * There must be an equal number of positive and negative conductors in a singleconduit. Only one ground conductor is required in each conduit.• Battery Cable Routing Requirements using Raceway:• * Positive and negative battery cables must be run side by side in the raceway in analternating pattern (+ - + - + - + -).• * There must be a ground cable running in the raceway with the battery cables.1. Route the battery cables between the ISBM section and the battery system or battery disconnect. SeeFigure 32, Figure 33, Figure 35, and Figure 36 for wiring access information and terminal locations.2. If wiring the UPS for a common battery, proceed to Step 3; if wiring for a separate battery, proceed to Step5.3. Using hardware from the external wiring terminal hardware kit (see Table 17), connect the positive,negative, and ground DC power wiring from the battery systems or disconnects to the ISBM sectionbattery and ground terminals. Use one set of terminals for each UPM as shown in Figure 36. Seeparagraph for wiring and termination requirements.4. Proceed to Step 6.5. Using hardware from the external wiring terminal hardware kit (see Table 17), connect the positive,negative, and ground DC power wiring from the battery systems or disconnects to the ISBM sectionbattery and ground terminals. Use one set of terminals for each UPM. See paragraph3.2.4 UPS System Power Wiring Preparation for wiring and termination requirements.6. After wiring the UPS system to the facility power and critical load, be sure to ground the system accordingto local and/or national electrical wiring codes.7. If wiring interface connections, proceed to paragraph 3.2.5 UPS System Interface Wiring Preparation;otherwise, proceed to Step 8.8. When all wiring is complete, reinstall the top and bottom safety shield panels removed in paragraph4.8.1 External Power Wiring Installation, Step 2. Secure with the retained hardware.9. Reinstall the left front panel removed in paragraph 4.8.1 External Power Wiring Installation, Step 1 andsecure with the retained hardware.UPS System Installation