manuals
database
Your AI-powered manual search engine
Search
Home
Brands
Langer
Scanner
FLS 106 IC
Langer FLS 106 IC User Manual
Print this manual
Download
Langer FLS 106 IC User Manual
Also see for FLS 106 IC:
User manual
Table of content
Contents
Table Of Contents
Table Of Contents
Table Of Contents
Table Of Contents
Table Of Contents
Declaration of Conformity
General Information
Description of Symbols
Scope of Delivery
Technical Parameters
Technical Parameters of the Subassemblies
GND 25 Holder
GND 25 Ground Plane
SUH 106 Safety Enclosure
Requirements for the ChipScan-Scanner Software
Intended Use
Risks if Not Used for Its Intended Purpose
Hazard Due to Electrical Voltage
Safety Devices
Environmental Protection
Overview of the FLS 106 Scanner
Guide Rails along the Y-Axis (Long Side)
Gantry
Aluminium Mounting Bracket
T-Slot Table
Control Panel with EMERGENCY STOP Switch and Control LEDs
ON / OFF Switch and Connectors
Connectors on the Z-Axis Tower
Overview of Attachments
DM-CAM with Camera Screw
Clamping Pieces
SH 01 Probe Holder
Delivery
Opening the Transport Box
Set-Up and Preparations for Putting the FLS 106 Scanner into Service
Setting up the FLS 106
Removing the Protective Film
Removing the Transport Protection from the Guide Rails
Checking / Releasing the EMERGENCY STOP Switch
Putting the FLS 106 Scanner into Service for the First Time
Installation
Checking the Cables of the Rotary Unit
Installing the DM-CAM Digital Microscope Camera
Installing the DM-CAM Digital Microscope Camera on the FLS 106 PCB
Connecting a Computer
Switching the FLS 106 Scanner on
Software Installation
Installing the ChipScan-Scanner Software
Putting the FLS 106 Scanner into Service with the ChipScan-Scanner Software
Fastening the Device Under Test
Fastening a Circuit Board on the UH DUT Universal Holder
Fastening the Circuit Board
Installing the GND 25 Ground Plane for IC Measurements
Installing the GND 25 Ground Plane
Installing an ICR Near-Field Microprobe
Connecting the ICR Near-Field Microprobe
Installing the BT 706 Bias-Tee
Collision Control of the ICR Probe
Installing a Near-Field Probe with the SH 01 Probe Holder
Connecting a Near-Field Probe Directly to the FLS 106 IC Scanner
Connecting a Near-Field Probe with a Preamplifier
Installing a Near-Field Probe on the FLS 106 PCB
Connecting a Near-Field Probe Directly to the FLS 106 PCB Scanner
Collision Control for the Near-Field Probe
Operational Notes
Estimating the Duration of a Measurement with the FLS 106 Scanner
Memory and Storage Requirements for the Measurement
After Completing the Measurement
Removing the Preamplifier / BT 706 Bias Tee
Maintenance
Dismantling
Disposal
Customer Service
Warranty
- 13 / 83 -
LANGER
EMV
-
Technik
DE
-
01728 Bannewitz
mail@langer
-
emv.de
www.langer
-
emv.
de
FLS 106 IC set / FLS 106 PCB set
Figure
4
:
Claws from above with the
long
hole
and M3 screw
GND 25 Holder
4.2.3
Figure
5
: GND
25
holder
with anti
-
rotation element
Previous
Next
/ 83
Zoom view
This manual is suitable for:
FLS 106 IC
FLS 106 PCB
manuals
database
Your AI-powered manual search engine