Powering down/up applications (examples)Servicing the Network Management Module – 181••••••3. In the Pairing with shutdown agents section, select the time to accept new agents and press the Start button and thepress Continue. During the selected timeframe, new agent connections to the Network Module are automatically trusted andaccepted.STEP 2: Action on the agent (IPP) while the time to accepts new agents is running on the Network Module1. Connect to the web interface of the agent.2. Detect the UPS Network Module with a Quick scan, Range scan or an Address(es) scan.3. Right-click on the UPS Network Module when discovered and then Set as power source, Configure it, and Save it.STEP 3: Action on the Network Module1. Make sure all listed agents in the card (Contextual help>>>Protection>>>Agents list) belong to your infrastructure, if not,access may be revoked using the Delete button.2. If the time for pairing still runs, you can stop it. Press Stop in the Pairing with shutdown agents section.4.2.3 Pairing with manual acceptanceManual pairing provides the maximum security.STEP 1: Action on the agent (IPP)1. Connect to the web interface of the agent2. Detect the UPS Network Module with a Quick scan, Range scan or an Address(es) scan.3. Define the power sourceNote: After that stage, the agent creates a client certificate. The power source could show a communication loss since thecurrent client certificate is not trusted by the Network Module.4. Copy the agent certificate file client.pem that is located in the folder Eaton\IntelligentPowerProtector\configs\tls..STEP 2: Action on the Network Module1. Connect to the Network ModuleOn a network computer, launch a supported web browser. The browser window appears.In the Address/Location field, enter: https://xxx.xxx.xxx.xxx where xxx.xxx.xxx.xxx is the static IP address of the NetworkModule.The log in screen appears.Enter the user name in the User Name field.Enter the password in the Password field.Click Login. The Network Module web interface appears.2. Navigate to Contextual help>>>Settings>>>Certificate page3. In the Trusted remote certificates section, click Import, select Protected applications (MQTT) and then click on CONTINUE4. Select the client.pem file previously saved, click Open. Communication with the agent is restored.4.3 Powering down/up applications (examples)4.3.1 Powering down IT system in a specific order4.3.1.1 TargetPowering down applications first (when on battery for 30s), database servers next (3min after the applications), and storage last (aslate as possible).STEP 1 and STEP2 can be done either ways.