Powering down/up applications (examples)Servicing the Network Management Module – 185••••••4.3.2.2 Step 1: Installation setup4.3.2.2.1 ObjectiveUse load segmentation provided by the UPS to independently control the power supply of each IT equipment categories(Applications, Database servers, Storage).Load segmentation also allows IT equipment to restart sequentially on utility recovery (Restart sequentially the IT equipment onutility recovery).4.3.2.2.2 Resulting setupUPS provides outlets (Group 1 and Group 2) and a primary output.Connections can be done as described below:Group 2: non-priority equipmentGroup 1: critical equipmentPrimary: critical equipment4.3.2.3 Step 2: Agent settings4.3.2.3.1 ObjectiveEnsure IT solution is shutdown gracefully.4.3.2.3.2 Resulting setup1. Install IPP Software on each server (Application, Database servers, Storage) and register the UPS load segment as power source:Critical equipment: Group 1Non-priority equipment: Group 2Critical equipment: Entire UPS2. Pair agent to the Network Module (Pairing agent to the Network Module).When done, each server appears in the Agent list.3. Navigate to Contextual help>>>Protection>>>Agent shutdown sequencing pageWhen primary shuts OFF, both group 1 and group 2 shut OFF immediately.For examples of Agent settings, see the Agents shutdown sequencing sections.