Chapter 1313-25F-13-43MEMO:To form a loop, wind the charging wire around a hex key once, and turnthe hex key three to four times; then, twist the charging wire.5) Cut the twisted charging wire (excess) with nippers.6) Hook the loop on stud A.7) After routing the wire for 31 runs, lead it through section B, and giveit a half turn; then, put it between the washer and the motor unit, andwind it once around the mounting screw (clockwise), and secure it inplace with a mounting screw.F-13-448) Cut the excess of the charging wire with nippers.9) Tighten the mounting screw loosened in step 3).Keep tightening until the tension of the grid wire is even.Be sure to pay attention to avoid defor-mation (slack) of the chargingassembly (as by tightening the mounting screw found on the front ofthe left/right shielding plate early).10) Tighten the mounting screws loosened in steps 1) and 2).11)Wipe the grid wire with lint-free paper moistened with alcohol.1. Check to make sure that the grid wire is free of bending and twisting.2. Be sure that the runs are laid at equal intervals (i.e., the wire is in thegroove of the block).13.5.4 Adjusting the Height of the Charging Wire0009-5712[1] Primary Charging assemblyHeight of charging wireF-13-45-/+1 mm[2] Pre-transfer Charging assemblyHeight of charging wireF-13-46No height adjustingmechanism[3] Transfer Charging assemblyHeight of charging wireF-13-47-/+2 mm[4] Separation Charging assemblyHeight of charging wireF-13-48-/+2 mmMEMO:The height (position) of the pri-mary charging wire and the transfercharging wire may be adjusted by turning the screw found at the back ofthe charg-ing assembly; a single turn changes the position of thecharging wire by about 0.7 mm.13.5.5 Mounting the Cleaning Blade0009-5703When mounting the cleaning blade, be sure that the side with themarking [1] will be the face.1) Push in the cleaning blade [2] until it butts slightly again the rear.F-13-492) Tighten the five mounting screws [3] lightly, stopping to turn themwhen re-sistance is felt.3) Turn the screws tightened lightly in step 2) about 20 deg to 30 deg inthe order indicated, tightening them fully.ScrewStud AScrew B7.5 +1.5- 0 mm7.5 +1.5- 0 mm10.06 0.3 mm9.5 0.5mm16.0No gap Blade retainingplate[2] [1]