Chapter 1616-132T-16-134COPIER>FUNCTION>INSTALLSubheading Contents LevelSTIR-Y/M/C/KStir developer in the developing unit (Y/M/C/K).Select an item to highlight it and press the OK key. The operation starts. 1STIR-4 Stir four-color developer in order.Operation methodSelect an item to highlight it and press the OK key. The operation starts.1SPLY-H-Y/M/C/KPerform initial supply from the toner container (Y/M/C/K) to the toner buffer.Select an item to highlight it and press the OK key. The operation starts. 1SPLY-H-4 Perform initial supply from the four-color toner cartridge to the toner buffer.Operation methodSelect an item to highlight it and press the OK key. The operation starts. 1CARD Make a setting for installation of the card reader.1 to 2001 [Factory setting value / Value after RAM clear: 0]Enter the card number and press the OK key. (Numbers for the number of cards specified byCOPIER>OPTION>BODY>CARD-RNG in Level 2 starting from the entered number areavailable.)The card control information (a section ID and password) is initialized.1KEY Recognize the control key function.0: Do not recognize the control key function.[Factory setting value / Value after RAM clear: 0]1: Recognize the control key function.1) Select COPIER>INSTALL>KEY and enter "1".2) Turn OFF/ON the main power switch. (The control key function is recognized.)1INISET-Y/M/C Initial installation of the Y/M/C color developerSimultaneously execute a series of operation required for initial installation of the Y/M/C colordeveloper.Operation method1) Select an item to highlight it and press the OK key.- Start the operation.- Execute countdown.2) After the operation completes, OK is displayed.The settings executed by this mode are shown below.- Electric potential control- Primary transfer ATVC- Development idling (adjustment of the charging volume of the developer)- Correction of the optical volume of the patch detection sensor (adjustment of the optical volumeof the patch detection sensor)- Transfer cleaning ACVC (determination of high pressure of the transfer cleaning upstream/downstream brush)- Optical ATR initial setting (initial setting of noncontact optical ATR)- Initial setting of patch electric potential control (initial setting of patch electric potential)- Initial setting of patch detection (initial setting of patch detection ATR)1AINR-OFF Make a setting to invalidate the initial multiple rotations for initial installation.This is a mode to make a setting to invalidate the initial multiple rotations for initial installation.This mode is executed so that the image formation sequence does not operate by a patch or Dmax/Dhalf in the initial multiple rotation sequence before initial installation is performed and does notdamage and wear the inside of the machine. When the initial setting for color toner(FUNCTION>INSTALL>INISET-4) is normally completed, the invalidation of initial multiplerotations is automatically released. (This prevents a failure to turn the switch back to the originalposition.) When the initial setting is not completed, the invalidation is not released.Setting range0: Initial multiple rotations are valid.1: Initial multiple rotations are invalid.This is an item to control Dcon.[Factory setting value / Value after RAM clear: 0]1E-RDS Make a setting for switching the use of E-RDS.Set if using E-RDS (Embedded-RDS) to send device information of a device counter, failure, orconsumables to a sales company's server via SOAP protocol, or not.1Setting value0: Do not use E-RDS.1: Use E-RDS.[Factory setting value / Value after RAM clear: 0]