Chapter 77-103F-7-2194) Move the 2 potential guide plate arms [1] in the direction of [A] first, andthen, move them in the direction of [B].F-7-2205) Lift the tension roller pressure lever [1] in the direction of the arrow.F-7-2216) Remove the idler roller [1] in the direction of the arrow.- 1 bearing [2]- 1 wheel [3]F-7-2227) By holding the 1cm areas [2] from the both edges of the ITB [1], pull itout in the direction of the arrow to remove.Take care not to touch the surface of the ITB with hands.F-7-223Once removed, the ITB should be stood on its end on paper spread on thefloor.7.14.28 Primary Transfer Roller7.14.28.1 Preparation for Removing the Primary TransferRoller 0013-9715imagePRESS C1 P / imagePRESS C1 / imagePRESS C1+ (Printer) / image-PRESS C1+1) Open the front cover.2) Detach the process unit cover.3) Lift the hopper unit.4) Remove the primary charging assembly. (page 7-86)Reference [Re-moving the Primary Corona Assembly]5) Remove the pre-transfer charging assembly. (page 7-88)Reference [Re-moving the pre-transfer corona assembly]6) Remove the drum unit. (page 7-89)Reference [Removing the DrumUnit]7) Pull out the fixing/feeding unit.8) Remove the intermediate transfer unit. (page 7-100)Reference [Remov-ing the Intermediate Transfer Unit]9) Remove the ITB cleaning unit. (page 7-99)Reference [Removing theITB Cleaning Unit]10) Remove the ITB. (page 7-102)Reference [Removing the ITB]7.14.28.2 Removing the Primary Transfer Roller 0013-9716imagePRESS C1 P / imagePRESS C1 / imagePRESS C1+ (Printer) / image-PRESS C1+1) Shift the primary transfer roller pressure arm [1] in the direction of the ar-row.[1][2][3][1][1][A][A][B][B][1][1][1][2][3][1][2][2]