– 55 –ENGPRIMARY AND SECONDARY SHEAVES768544321(14)(9)T R..10 Nm (1.0 m • kg, 7.2 ft • Ib)T R..10 Nm (1.0 m • kg, 7.2 ft • Ib)T R..10 Nm (1.0 m • kg, 7.2 ft • Ib)T R..10 Nm (1.0 m • kg, 7.2 ft • Ib)T R..100 Nm (10.0 m • kg, 72 ft • lb)T R..100 Nm (10.0 m • kg, 72 ft • lb)109Order Job name/Part name Q’ty Remarks5 Primary sliding sheave assembly 1 Refer to “REMOVING THE PRIMARYAND SECONDARY SHEAVES” and“INSTALLING THE PRIMARY ANDSECONDARY SHEAVES” inCHAPTER 4.(Manual No.: 5TE-F8197-10)6 V-belt 17 Primary fixed sheave 18 Secondary sheave assembly 19 Drive belt case 110 Rubber gasket 1For installation, reverse the removalprocedure.