POWR Power unit5-53 67C3K113. Install the apron and oil dipstick.4. Connect the shift link rod 5, and theninstall the clip 6.5. Connect the throttle cable and shiftcable, and then adjust them.NOTE:To adjust the throttle cable and shift cable,see “Adjusting the throttle cable” (3-8) and“Checking the gear shift operation” (3-9).6. Connect the flushing hose 7, coolingwater hose 8, and fuel hose 9.7. Connect the engine shut-off switch leads0 and the warning indicator assemblycoupler A. (M model)Connect the warning indicator assemblycoupler A and 10-pin main harness B tothe power unit. (E and W model)È M modelÉ E and W model8. Connect the PTT motor leads C. (PTTmodel)Connect the PTT switch coupler D andtrim sensor coupler E. (R model withPTT)9. Connect the battery cables F. (E and Wmodel)S67C516665S67C51608 7 9S67C51670AÈS67C5168BAÉS67C5169CDES67C5170F