Required service partsNoteArticle numberConsumableLocated at the front link ear of thebalancing device.Replace if damaged.3HAC4836-26Protection plugLocated at the cradle of the balan-cing device. 2 pcs required.Replace if damaged.3HAA2166-13VK cover, 100x10Loctite 2400 (or equivalent Loctite243)-Locking liquidMercasol 3110 Waxcoat. Recom-mended drying time is 24h.3HAC034903-001Rust preventiveLoctite 5400 (or equivalent Loctite577)-Flange sealant for conical fittingsLoctite 2400 (or equivalent Loctite243)-Locking liquidRequired tools and equipmentNoteArticle numberEquipmentUsed to secure lower arm.-Lock screw, M16x120Used to unload or restore a balan-cing device.User instructions are enclosedwith the tool.3HAC074411-001Hydraulic press equipment, balan-cing deviceUsed for removing and fittingshaft and bearings.User instructions are enclosedwith the tool.3HAC028920-001Dismantle and mounting toolTo be used with the press andpuller tools.See technical specifications in theuser instructions for the pressequipment.3HAC13086-1Hydraulic pump 80 MPaTo be used with the press andpuller tools.See technical specifications in theuser instructions for the pressequipment.3HAC11731-1Hydraulic cylinderLifting instruction 3HAC15880-2enclosed.3HAC15556-1Lifting accessory (chain)SA-10-8-NA1-Lifting shackleContent is defined in sectionStandard toolkit on page 629.-Standard toolkitContinues on next pageProduct manual - IRB 6720 1953HAC085697-001 Revision: C© Copyright 2023 ABB. All rights reserved.5 Repair5.3.1 Replacing the balancing deviceContinued