SITE PREPARATION2-2 Edition One XC1000 Service Screwdrivers, Phillips, #1 and #2 Allen wrench set Cable ties, nylon2.2 SITE-ENTRY CLEARANCESXC1000 arrives at the site shipped in a crate on a pallet. Consider the followingto ensure that the XC1000 can reach the proposed site: Transport the crated XC1000 to the operating location or unpack thecrate and box outside and move the uncrated cabinet to the operatingposition. Determine a route that has unrestricted passage through doorways,halls, and elevators to the XC1000 site from the shipping dock.Figure 2-2 shows XC1000 dimensions and crate dimensions.26 IN. WIDE (66 CM)64 IN. HIGH84 IN. CRATE HEIGHT (208 CM)18 IN. DEEP41 IN. CRATE DEPTH42 IN. CRATE WIDTH(46 CM) (104 CM)(163 CM)(107 CM)Figure 2-2. XC1000 Dimensions, Crated and Uncrated.2.3 SPACE REQUIREMENTSPlan a location for the XC1000 that is close enough to the switch equipmentfor optimum performance. For example, at sites using RS-232 integrationsand where the length of a data link exceeds 50 feet (17 meters), other thantelephony loop length, use customer-supplied data sets to extend the linkbetween the switch equipment and the main distribution board on theXC1000. At sites using other types of integration, for example, in-band, noSECTION 2.1 – 2.3