RELEASE 4.X FCP CONVERSION INSTRUCTIONS17-22 Release 4.X XC1000 ServiceIf Aspen/Maxum/Branch/XP:1. Connect COM1 to physical port 3 (logical channel 4).2. Connect COM2 to physical port 1 (logical channel 2).If Sierra/XC1000:1. Connect COM1 to port J50 (logical channel 4).2. Connect COM2 to port J43 (logical channel 2).Press to continue.!!! INSTRUCTION !!!Figure 17-60. Instruction Screen for VerifyingCable Connection.12. Press Enter.13. The script (FCP conversion program) starts running. If the cablingbetween the PC and the XC1000 was not done properly, if the SMTpassword was entered incorrectly, or if the XC1000 was not at theSMT Main Menu when it was disconnected, an error screen shown inFigure 17-61 appears. If the error screen does not appear, proceed tostep 14.If the error screen does appear, press Enter. If the error screen doesnot reappear, proceed to step 14.If the error screen reappears, press Esc to terminate the FCP conver-sion and return to the DOS C:\FCP> prompt.SMT port is not connected,password is not correct, or the VPM is not on–line.Press to quit. Press to retry.Figure 17-61. Error Screen. If the cabling between the PC and the XC1000 was not doneproperly, do the following:a. Repeat the steps listed in section 17.8.b. At C:\FCP>, type fcpconv and press Enter.c. At the FCP conversion Main Menu (Figure 17-49), selectoption 2. Perform/Continue Conversion and pressEnter. When the screen displays the “... Stopped atstage #: 10 Continue the Conversion (Y/N): Y” prompt,press Enter to continue. The conversion resumes fromthe point where the failure occurred.SECTION 17.9