33-1Edition OneXC1000 ServicePLATFORM INSTALLATION3.1 OVERVIEWInstalling the XC1000 involves ensuring equipment and personnel safety;obtaining all required tools; unpacking and inspecting the equipment;positioning the cabinet; attaching the accessories; installing the auxiliaryshelf; connecting the power and other cables; installing the primary systemmanager terminal (SMT); setting the configuration switches; and checkingthe entire installation. Figure 3-1 shows the major installation tasksdescribed in this chapter.RECEIVE, INSPECT,AND UNCRATE THEXC1000 EQUIPMENT.PLACE THE CABINETIN POSITION.CONNECT –48-VDCPOWER ANDGROUND.CONNECT CO SWITCHCONNECTORS TOBACKPLANE.CONNECT ALARMS,DATA LINKS, AND X.25TO MAIN DISTRIBUTIONPANEL.CONNECT INTEGRATIONDATA LINKS AND MTA TOACP I/O DISTRIBUTIONBOARD.CONNECT BUSY-OUT CABLE ANDPOWER.INSTALL SMT ANDPRINTER.VERIFY OR SETCONFIGURATIONSWITCHES.CHECK SYSTEMWIRING.INSTALLATIONCOMPLETE.PROCEED WITHINITIAL STARTUPPROCEDURE.ENSURE EQUIPMENTAND PERSONALSAFETY.OBTAIN TOOLS.Figure 3-1. Installation Procedures.Before installing the XC1000, the site must be prepared as described inChapter Two, Site Preparation. All power, telephone, and data-link cablingmust be installed and properly terminated for connection to the XC1000.3.2 ENSURING EQUIPMENT AND PERSONNEL SAFETYPreventing injury and safeguarding the equipment must be primary con-siderations during the XC1000 installation. Safety issues include electrical,equipment-handling, and environmental safety.Follow the installation procedures in this chapter to prevent equipmentdamage and personal injury. Safety hazards arise from the weight and bulkof the XC1000 and the electrical connections that must be made.