RELEASE 2.X UPGRADE INSTRUCTIONS13-38 Edition One XC1000 Service7. When the Garbage Collect Complete message appears, turn offcontinuous-printing mode by pressing the Copy Pr key on the HPterminal or the Ctrl, Shift, and Print keys on the Wyse 50 terminal.8. Press any key to return to the > prompt.9. Type ^C to return to the Main Menu.10. If the X.25 link was stopped in section 13.17.3, restart the link usingmenu 18.3.13.17.9 Return the XC1000 to ServicePerform the following steps to return the XC1000 to service:1. Enable all multiple-line hunt groups and SMDI links going to theXC1000, so that calls are again directed to XC1000. Reverse the methodthat was used to disable the hunt groups and SMDI links in section13.17.4.2. Test the integration by making calls to an extension that has amailbox on the XC1000. Personal greetings should be heard. Makesure that all ports on the XC1000 answer properly.3. Return the XC1000 to the system manager.13.18 HIGHLIGHTS Before upgrading a XC1000 to Release 2.X, all required equipmentmust be available. The upgrade to Release 2.X requires the following procedures: Service option enabled Validity checks run Garbage collect run System-drive 0 backed up Hardware upgraded EMI shielding installed Software upgraded New software and phrases copied to system drives Node records converted to user records Existing system-distribution lists converted to type 6 mailboxes(upgrades to software preceding 1.5X) Company records and attendant schedules converted to userrecords On-line validity checks and garbage collect performed Serial channel parameters configured (upgrades to softwarepreceding 1.5X) The special message-waiting feature for SMDI integrations enabled XC1000 returned to service If the software in the XC1000 must be updated from Release 2.X to anewer version of 2.X, an update procedure can be used.SECTION 13.17 – 13.18