7-10Wiring harness012345678910A4. Install the bracket a, and then connectthe oil pressure sensor coupler f,thermoswitch connectors g and ignitioncoil couplers h.5. Connect the fuse box couplers k, m,and connector n, and then install thefuse box.6. Install the engine ECM b, and thenconnect the engine ECM coupler p andpulser coil coupler r.7. Install the cover c.8. Connect the hour meter coupler s.9. Install the wiring harness to the bracketsd, and then connect the TPS coupler t,ISC coupler u, air pressure sensorcoupler v, and engine temperaturesensor coupler w.10. Insert the projections x on the plasticties e into the holes in the fuel rail f,and then connect the fuel pump couplery.fghakmnrbpcsvu dwtfyex