Small Office Remote Access Switch 551SYSTEM S TATISTICSFrame Relay Statistics# NEW & Existing PVCThe number of times a NEW PVC was indicated by a LMI STATUS message—but the frame relaysoftware believed the PVC already existed.# PVC Not ConfiguredThe number of times a frame was received containing an unknown DLCI value, and hence, anunconfigured PVC.# No NEW BitNot currently supported.# Not Full ENQUIRYThe number of times a STATUS message was received containing a LINK INTEGRITYVERIFICATION ONLY report type, when in fact a FULL REPORT was expected.# Errored Full ENQUIRYThe number of times an errored STATUS message was received of type FULL REPORT.# Delete Absent PVCNot currently supported.# Errored LMI HeaderThe number of LMI frames received in which the LMI encapsulation header was errored.PVC R ELATED STATISTICSPVC StateThe condition of the Frame Relay Permanent Virtual Circuit. Possible values are: TERMINATED,INIT, NOT READY, and NETWORK OUTAGE. The definitions for the possible values are as follows:TERMINATEDThe PVC state entered when the PVC has been dynamically removed.INITThe PVC state entered when the PVC is ready for use.NOT READYThe PVC state entered when the PVC has been marked unavailable by the network via aSTATUS message, an alarm condition, or failure of the LMI link.NETWORK OUTAGEThe PVC state entered when the PVC has been marked unavailable. This follows thereceipt of a CLLM message indicating a network failure has occurred.# PVC activationsThe number of times the PVC has been marked available for use, or “up”.# PVC deactivationsThe number of times the PVC has been marked unavailable for use, or “down”.# Frames receivedThe total number of frames received on the PVC.